Home | NEWS | PROJECTS | SERVICES | EMPLOYMENT | CONTACT US

| PROJECTS |

Tipton Lemon St. Improvements

Project Name & Location:
Lemon Street Improvement Project
Tipton, IA

Completion Date: 2004

Project Owner’s:
City of Tipton
407 Lynn Street
Tipton, IA 52772-1633

Project Owner’s Contact:
Doug Boldt
City Manager
319-886-6187

Project Cost: $ 339,880

Project Description:

The improvement project consisted of reconstructing 9 blocks of street pavement with Hot Mix Asphalt (HMA) paving. Six (6) blocks of the street were reconstructed between existing curb and gutter. Three (3) blocks were entirely reconstructed from curb to curb; this area included new drainable base and longitudinal sub-drain. Tipton Elementary school access is on Lemon Street; therefore the project was on a tight schedule. The project started after school was out and was in operation by August.

Engineer:

Jack Pope, P.E.

Funding:
Tipton General Fund

Contractor:
L.L. Pelling Company, Inc
1425 W Penn Street
North Liberty, IA 52317

 


 

 

 

 

 


Copyright Garden & Associates, LTD 2005 | P.O. Box 451 Oskaloosa, IA 52577 |
1-800-491-2524 | 641-672-2091 (fax) | email@gardenassociates.net
Site Design By Affinity Business Solutions