Home | NEWS | PROJECTS | SERVICES | EMPLOYMENT | CONTACT US

| PROJECTS |

Lovilia Wastewater Treatment

Project Name & Location:
Contract 1: Wastewater System Improvements
Contract 2: Slope Stabilization Project
Lovilia, IA

Completion Date: 2004

Project Owner:
City of Lovilia
1613 E Avenue South
Lovilia, IA 50150

Project Owner’s Contact:
David Beary
Mayor
641-946-7711

Project Cost:

Contract 1: $ 596,996 | Contract 2: $ 91,284

Project Description:
Conversion of controlled discharge lagoon to 3-celled aerated facility with additional detention. Work included construction of blower building, new flow measurement equipment and lagoon flow control structures. The slope stabilization project included the clearing, grading and installation of storm sewer to stabilize a slope to protect existing utilities and property.

Engineer:
Jack Pope, P.E.

Funding:
Lovilia General Fund
CDBG Grant
IDNR State Revolving Loan Funds

Contractors:
Lawson Construction
29032 State Highway
Kirksville, MO 63501

Dunkin Construction
113107 Dean Ave.
Bussey, IA 50044

 


 

 

 

 

 


Copyright Garden & Associates, LTD 2005 | P.O. Box 451 Oskaloosa, IA 52577 |
1-800-491-2524 | 641-672-2091 (fax) | email@gardenassociates.net
Site Design By Affinity Business Solutions