Project Name & Location:
Contract 1: Wastewater System Improvements
Contract 2: Slope Stabilization Project
Lovilia, IA
Completion Date: 2004
Project Owner:
City of Lovilia
1613 E Avenue South
Lovilia, IA 50150
Project Owner’s Contact:
David Beary
Mayor
641-946-7711
Project Cost:
Contract 1: $ 596,996 | Contract 2: $ 91,284
Project Description:
Conversion of controlled discharge lagoon to 3-celled aerated
facility with additional detention. Work included construction
of blower building, new flow measurement equipment and lagoon
flow control structures. The slope stabilization project included
the clearing, grading and installation of storm sewer to stabilize
a slope to protect existing utilities and property.
Engineer:
Jack Pope, P.E.
Funding:
Lovilia General Fund
CDBG Grant
IDNR State Revolving Loan Funds
Contractors:
Lawson Construction
29032 State Highway
Kirksville, MO 63501
Dunkin Construction
113107 Dean Ave.
Bussey, IA 50044
|